• VIP Polymers

Sprayed waterproofing approved for Bane NOR 21 Dec 2017

Minova News Release
Tekflex water control membrane applied to tunnel lining
Tekflex water control membrane applied to tunnel lining

Official approval has been granted for the application of a sprayed water-control membrane product in tunnel projects for Bane NOR, the Norwegian national rail authority. The spayed membrane product, Tekflex, is supplied by Minova and provides a thin flexible, permanent sprayed membrane to control water in tunnels or to provide a reliable repair and refurbishment solution. The Tekflex range includes wet and dry products for use in structural as well as waterproofing tunnelling applications. This includes cement based and resin injection products.

The membrane was chosen by Bane NOR as it has good cohesion to rock surfaces, high tensile strength with high flexibility, is easy to apply using standard equipment, and is non toxic and non flammable.

Started more than 135 years ago, Minova is a global manufacturer and supplier of chemical and mechanical earth control products, adhesives and support equipment with manufacturing plants on five continents and operations in more than 25 countries.

References

Add your comment

Thank you for taking the time to share your thoughts and comments. You share in the wider tunnelling community, so please keep your comments smart and civil. Don't attack other readers personally, and keep your language professional.
In case of an error submitting Feedback, copy and send the text to Feedback@TunnelTalk.com
Name :


Date :

Email :


Phone No :

   Security Image Refresh
Enter the security code :
No spaces, case-sensitive