• Alert Sign Up
NEW PRODUCTS

Delivering superior shotcrete solutions 08 Sep 2016

GCP News Release

USA-based GCP Applied Technologies announces the introduction of its TYTRO® Shotcrete System (TSS), a complete state-of-the-art admixture solution that is designed to deliver lower costs, superior performance and reduced cycle times in comparison to conventional systems that are currently available.

GCP TYRTO Shotcrete System offers improvements on conventional systems
GCP TYRTO Shotcrete System offers improvements on conventional systems

The new system includes a nanotechnology-based rheology control agent, patented macro synthetic fibers, and a number of other newly developed admixtures that improve the efficiency of the spraying operation, as well as the material performance.

In addition to providing the capability for a reduction in operating costs and minimizing excavation downtime – without sacrificing performance or relaxing safety standards – the TYTRO® Shotcrete System provides faster early strength and enhanced bonding-to-rock with an increased one-pass thickness build-up. The system also minimizes rebound during spraying.

The main advantages provided by the TYTRO® Shotcrete System, based on results from both internal and external data, and compared to conventional mixes include:

  • Up to 10% lower installed cost, achieved through mix optimization, waste minimization and shorter cycle times;
  • Rebound rates reduced by 5–8%;
  • Faster re-entry times, due to more rapid early-age strength development at equal accelerator dosage rate;
  • Superior bond-to-rock and adhesion between layers, providing greater thickness in a single pass; and
  • A more robust and dosage efficient system.

GCP’s complete portfolio of solutions for the mining and underground construction industries includes admixtures for shotcrete and concrete, proprietary fiber reinforcement systems, injection technologies for ground support, and waterproofing systems for shotcrete.

The company – which is headquartered in Cambridge, Massachusetts – combines its technical expertise in shotcrete mix design optimization, on-site monitoring systems and ground control technologies, to fit the unique requirements of each individual project. Additionally, GCP’s technical specialists work to provide solutions for overcoming geotechnical challenges around the world.

GCP Applied Technologies provides specialty construction chemicals and specialty building materials for many of the world’s most renowned structures. With customers in 110 countries, operations on six continents, and a team of approximately 2,850 employees, GCP enjoyed 2015 net sales of US$1.4 billion. Formerly part of the W.R. Grace & Co. Group, GCP Applied Technologies Inc. became a NYSE-listed company (GCP) in February 2016.

References

           

Add your comment

Thank you for taking the time to share your thoughts and comments. You share in the wider tunnelling community, so please keep your comments smart and civil. Don't attack other readers personally, and keep your language professional.
In case of an error submitting Feedback, copy and send the text to Feedback@TunnelTalk.com
Name :


Date :

Email :


Phone No :

   Security Image Refresh
Enter the security code :
No spaces, case-sensitive