Page 11 - TunnelTalk Annual Review 2011
P. 11

Using blast plane as the basis for planning makes all the difference
“I sincerely recommend iSURE. Using this tool can easily save up to half a million Euros in just
1 kilometer of tunnel.”*
TOMMI SALO | PRODUCT LINE MANAGER,TUNNELING JUMBOS | SANDVIK CONSTRUCTION
Intelligence
expanded
Well planned is halfway done. To support you in your daily tunneling work, Sandvik
has expanded the intelligent iSURE tunneling excavation management tool to be compatible with not only computer-controlled jumbos but also with instrumented models.
iSURE is designed for the people on site. Even if it is revolutionary in its approach, it still follows the natural way of thinking. The iSURE uses the most critical location of the round – the blast plane – as the basis for the whole planning process. As a result, hole locations, and thus blasting, are optimized. This means excellent accuracy, fast process and high profile quality. Not to mention large-scale savings. Sandvik – understanding underground.
*Learn more about iSURE at www.understandingunderground.sandvik.com www.construction.sandvik.com
PREVIEW


































































































   8   9   10   11   12