From the Editor's Desk - 04 Aug
2016 |
High speed magnetic levitation rail technology - maglev - remains in its infancy. With manned speeds of 581km/hr already demonstrated, the possible future benefits for underground intercontinental and long distance transportation are tantalising.
|
From us, to you, to them - Direct
by Design |