Page 4 - TunnelTalk Annual Review 2017
P. 4
WORLD CLASS TUNNELING EXPERIENCE
TOP CLOCKWISE: Istanbul Strait Road Tunnel Crossing Istanbul, Turkey | Elizabeth River Tunnels Norfolk, Virginia Tom Lantos’ Tunnels California | Alaskan Way Tunnel Seattle, Washington
HNTB experts have the insight and knowledge to provide innovative solutions on a wide range
of tunnels, including small-diameter excavations to the largest machine-bored tunnel in the world. We have a long history in planning, program management, design, construction management and technical services on some of the country’s most complex tunneling projects.
Sanja Zlatanic
National Tunnel Practice Leader Chief Tunnel Engineer szlatanic@hntb.com
(212) 294-7567
The HNTB Companies
Infrastructure Solutions
hntb.com
PREVIEW