Page 3 - TunnelTalk Annual Review 2015
P. 3
Welcome to a preview of the digital edition of the TunnelTalk annual review 2015 which allows you free access to the first few pages of the issue as a trial.
Each of the articles in the Annual Review has been published first on www.TunnelTalk.com, the leading online magazine for the global underground construction industry.
All the articles are hotlinked to the TunnelTalk online Archive allowing for direct, free access to the full coverage and a wealth of additional information. All advertisements are also hotlinked directly to the advertiser’s website. All featured videos are linked to the TunnelTalk YouTube channel.
Please see the final page of this preview for information on how to purchase full versions of each digital issue of the Annual Review since 2010, allowing you to build a historic reference of the international tunnelling industry.
Annual Review 2015
Welcome to the sixth edition of the TunnelTalk Annual Review, a year of industry news and developments in one publication. Everything in the publication has been published first on TunnelTalk.com, the web gateway to coverage of global activity in underground space engineering, construction and advancement.
This is the only bookshelf reference yearbook for the international industry and all content in the journal is supported with more detailed articles and reporting on the website. The references at the foot of every article and the QR codes provide quick links to support reading and video reporting on our comprehensive and free-to-access website Archive.
Unlike other industry websites, TunnelTalk.com is more than an aggregating service. It is an online industry magazine written, researched and reported by professional journalists and video reporters. Contributed technical articles from industry engineers and professionals add to a wide resource Archive of industry-specific research, development, discussion and debate.
Earlier volumes of the Annual Review are available to order via the web-magazine. Copies of the current issue will be distributed from the TunnelTalk stand at the main tunnelling conferences and exhibitions during 2016. We look forward to meeting you there!
Sign up to receive our free weekly Alert of new web-magazine content and explore the creative web and print advertisement opportunities available with TunnelTalk and research the commercial services we offer to fill Job Vacancies, facilitate Equipment Sales, and advertise contract Procurement schedules. Our global readership of more than 6,500 Alert recipients every Thursday is the link to your next customers.
TunnelTalk.com Archive Alert signup Annual Reviews
Editorial ContEnt
GLOBAL CONNECTIONS
05 Europe united
07 USA: Passenger demand exists for high speed rail
07 Korea: Record rail link
08 UK: HS2 begins construction procurement
10 Austria-Italy: Brenner attack
10 Switzerland: Ceneri Base Tunnel celebrations
11 Norway: Construction begins on Follo Line
12 Ukraine: Kerch Tunnel for Crimea security
13 Denmark-Germany: Fehmarn evaluations
15 Turkey: Highway under the Bosphorus 17 Hong Kong: Accelerating high speed rail
PROJECT PROGRESS
19 USA: Seattle Alaskan Way
23 USA: Seattle continues LRT expansion
24 USA: Toronto subway designs and extensions
25 USA: Presidio Parkway opens
26 USA: Rehabilitation of Boston harbor tunnels
26 USA: Midtown immersed tube connection
27 USA: Bay Bridge Tunnel expansion
28 USA: EPBM recovery in New York
28 USA: Value of used TBMs
29 USA: Los Angeles outfall
30 USA: Washington DC Clean Rivers program
32 USA: St Louis 44km CSO program
32 USA: California Bay Delta tunnel project
32 USA: Steep drive for Hawaii TBM
33 Ecuador: 22km metro construction awarded
33 Ecuador: Long hydro drive breaks through
33 Peru: Lima Metro funding boost
33 Mexico: Dual-mode crossover TBM assembly
35 Austria: Robbins double shield TBMs for GKI headrace
38 Norway: Historic breakthrough at Røssåga
39 Denmark: Cityringen extensions and breakthroughs
40 Germany: Shallow Berlin link drives Mixshield innovation
41 Sweden: Stockholm underground bypass
42 Norway: Drill+blast challenge for road tunnel underpass 42 Iceland: Delayed progress on highway headings
42 Germany: River Elbe pipejack
43 Norway: Deep level subsea road crossings
44 Switzerland: CERN accelerates collider upgrade
45 UK: Mega potash mine wins National Park planning consent 47 UK: Landmark achievements for Crossrail
50 UK: Funding secured for London supersewer
50 UK: Royal visit celebrates Lee Tunnel completion
50 UK: Glasgow TBM ready for launch
52 UK: London Underground Northern Line construction strategy 52 UK: Planned Thames River highway crossings
53 Turkey and Thailand: TBM successes
54 Australia: Sydney highway connections
54 New Zealand: Waterview excavation complete
55 Australia: Sydney advances metro ambitions
56 Australia: Melbourne metro plans revived
56 Australia: Underground link for Perth airport
58 India: Getting Bangalore Metro back on track
60 India: Slurry or EPB for conditions in Bangalore
62 India: EPBMs deliver success for Delhi Metro
62 Laos: TBM launch for Laos hydro
63 Malaysia: Kuala Lumpur MRT
64 China: CREG order for two gripper TBMs
66 Singapore: MRT extensions and contract awards
66 Qatar: Doha flood protection
66 Singapore: Sewer extensions
66 Qatar: IDRIS contracts awarded
67 Riyadh Metro progress
68 DISCUSSION FORUM
70 TunnelTECH AND INNOVATIONS 82 CONFERENCES
86 ITA INDUSTRY AWARDS
88 CAREER MOVES
92 INDUSTRY NEWS
Direct by Design
Copyright© TunnelTalk 2015. All rights reserved. No part of this publication may be reproduced, stored in a retrieval system, or transmitted in any form or by any means, electronic or otherwise, without the prior permission of the copyright owner. All views expressed in this journal are those of the respective contributors and are not necessarily the opinions of the publisher, neither do the publishers endorse any of the claims made in the articles or the advertisements. Printed by Buxton Press Ltd, UK.
PUBLISHER & EXECUTIVE EDITOR
Shani Wallis
REPORTER & ONLINE EDITOR
Peter Kenyon
REPORTER & NEWS BRIEFS EDITOR
Armand van Wijck
HEAD OF ADVERTISEMENT SALES
Binda Punj
DESIGN & PRODUCTION MANAGER
Claire Hunt
VOLUME 6 Order extra copies of the 2010-2015 issues online www.TunnelTalk.com ContactUs@TunnelTalk.com
PREVIEW