From the Editor's Desk - 29 Mar 2012
The cost of bringing ageing infrastructure into line with minimum EU tunnel safety standards by 2014 is causing headaches all over Europe, but in the case of the UK's 53-year-old Brynglas Tunnel the solution may be a new third bore.
|