Not displaying correctly? View in your browser
Click on the logos to visit the websites
BabEng Robbins
www.TunnelTalk.com keeping you informed
New Editorial Content
- Nepal: Double shield TBM project in procurement
- Career Moves: Falco joins United Underground
- Procurement: VTA BART seeks industry feedback
Recent reporting
- Conferences: Virtual WTC 2020 experience report
- ITA General Assembly: Reporting ITA business
- USA: Project Clean Lake progress
- Norway: First Oslo water contract awarded
- China: Mega slurry TBM ready for river crossing
- Industry News: New Annual Review out now
News from the world media services
Tough predictions for long deep TBM headings Tough predictions for long deep TBM headings
Join the Alert Forward to Colleagues
From the Editor's Desk - 24 Sep 2020
Long distance, deep level TBM headings hold the greatest of unpredictability and geological risk. Preparing for every eventuality and tempering expectations with realistic targets and well considered assumptions will avoid disappointment and contractual strife.

Share your views

From us, to you, to them - Direct by Design
Alert Delist Advertising Information
Click on the logos to visit the websites
Diary Dates
HNTB Normet
Terratec
CREG Tsurumi Pumps
Herrenknecht
Procurement DSI Underground
TunnelTalk Annual Review
For advertising details
contact the Advertising Dept
Tel: +44 208 816 8677
Tel: +1 602 399 7184
RECENT CONTENT PUBLISHED ON TUNNELTALK
Most recent reporting
- WTC extends virtual 2020 congress access
- Virtual ITA General Assembly cancels WTC 2021
- USA: Project Clean Lake progress
- Norway: First Oslo water contract awarded
- China: Mega slurry TBM ready for river crossing
- Conferences: Virtual WTC 2020 all set for start
- TBMs considered for M6 highway
- Western Harbour and Beaches Link plans
- NorthConnex opening delay
- Safety concerns for NorthConnex highway
TBMs in difficult ground
- Keep TBM moving against the odds
- Rebuilt TBMs, as good as new?
- Clawing success at Arrowhead
- TBM rescue for Tapovan
- TBM conquers Peruvian Andes
- Flexibility for battling poor geology
- TBM success at Kishanganga
- TBM equipped for high water pressure
- Laos early finish despite challenges
- TBMs through on long hydro drive in Ecuador
News Briefs
- Great Lakes oil pipeline concerns
- Vancouver MRT crossing options
- Scotland landslide road solutions
- HS2 option to save time and money
- Erionite concern in New Zealand
- Mexico rail and metro projects
- Work proceeds on Oaxaca highway
- Albania mountain pass tenders
- Box-jacking for Florida railway
- Kuala Lumpur flooding partly mitigated by SMART
VIDEO REPORTING: Long distance excavation experiences

Follo Line TBMs

Follo Line breakthroughs

Olmos rock bursting

Kishanganga headrace TBM

San Vicente breakthrough

Arrowhead completed

Seymour-Capilano drives

Lyon-Turin rail link

UPCOMING CONFERENCES AND EXHIBITIONS