Not displaying correctly? View in your browser
Click on the logos to visit the websites
Colorado School of Mines
HNTB Tsurumi Pumps
Terratec
BabEng AECOM USA
Herrenknecht
www.TunnelTalk.com keeping you informed
New Editorial Content
- Canada: Broadway Subway preferred bidder
- Nepal: Fatal gate failure on Melamchi project
- Switzerland: Design of Lotschberg repair works
- UK: Gas pipeline inserted into Humber River link
- Italy: Mega TBM breakthrough at Santa Lucia
- Procurement: Bid invitation for City of Columbus
Recent reporting
- Germany: Cologne collapse disaster settlement
- Conferences: 70% refund for WTC participants
- France-Italy: Lyon-Turin awards setup works
- Finland-Estonia: Political hiatus for sealink plans
News from the world media services
Fatal accident during Melamchi watering-up test Fatal accident during Melamchi watering-up test
Join the Alert Forward to Colleagues
From the Editor's Desk - 23 Jul 2020
It is a duty of engineers to study failures of the past and learn from historic experiences to assess the risks of their own projects and avoid the need of future generations to have to cope with the long term consequences of design mistakes and, as an utmost responsibility, to ensure the safety of everyone in the underground construction workforces.

Share your views

From us, to you, to them - Direct by Design
Alert Delist Advertising Information
Click on the logos to visit the websites
Normet
CREG
DSI Underground
Robbins
Gall Zeidler
For advertising details
contact the Advertising Dept
Tel: +44 208 816 8677
Tel: +1 602 399 7184
VMT
RECENT CONTENT PUBLISHED ON TUNNELTALK
Most recent reporting
- Germany: Cologne collapse disaster settlement
- Conferences: 70% refund for WTC participants
- France-Italy: Lyon-Turin awards setup works
- Finland-Estonia: Political hiatus for sealink plans
- Sydney opens underground highway
- Political hurdles prompt innovative options in USA
- Rock mechanics studies for siting repositories
- Repository construction and operation in Hungary
- WTC 2020: Virtual option sparks refund standoff
- Norway: Scope of Oslo raw water project
Hard lessons learned
- Fatal collapse on Cologne metro
- Lötschberg water inflow explained
- Rastatt TBM drive collapse concerns
- Symptoms of the collapse syndrome
- Sinkhole disruption in Fukuoka, Japan
- Salvage recovers Japan disaster TBM
- Metro sinkhole in Guangzhou
- Cairo Metro tunnel collapse
- Recovery reveals the unexpected
- Sinkhole bothers Brightwater
News Briefs
- Metro work in Kolkata halts due to Covid-19
- India approves Brahmaputra river crossing
- India resumes with all-weather mountain highway
- Tensions rise about mega dam in Ethiopia
- Water supply project finished in Manila
- Tallinn ring road alignment revised
- Amsterdam city crossing partially opened
- India close to finishing strategic mountain link
- Breakthrough at Kinnaur hydroelectric plant
- Michigan pipeline proposal slowed by commission
VIDEO REPORTING: Gatherings the way they were

ITA Awards 2016, Singapore

ITA Awards 2017, Paris, France

RETC 2019, Chicago, USA

WTC 2019, Naples, Italy

WTC 2017, Bergen, Norway

North American Tunneling 2018

ITA Awards 2018, Chuzhou, China

ITA Awards 2019, Miami, USA

UPCOMING CONFERENCES AND EXHIBITIONS