Not displaying correctly? View in your browser
Click on the logos to visit the websites
Hany-2 Geodata
Babendererede-1 VMT-1
HNTB Tsurumi Pumps
Herrenknecht
VIP Polymers-1 ITC SA
www.TunnelTalk.com keeping you informed
New Editorial Content
- Sweden: Rail link progress in Gothenburg
- USA: Lovsuns TBM order for US CSO project
- Thailand: Terratec double for complex geology
TunnelTECH
- Norway approves spray water-control membrane
- TBM turned within an hour
- Cast-in-gasket for a quality segmental lining
Diary Dates in 2018
- 23 Jan: George Fox conference, New York
- 28 Mar-1 Apr: International Mining Games
- 24-27 June: NAT 2018, Washington DC, USA
- 21-26 April: WTC 2018, Dubai, UAE
News from the world media services
Patented alternative to longitudinal ventilation
Join the Alert Forward to Colleagues
From the Editor's Desk - 21 Dec 2017
Holidays are designed for rest, relaxation and for catching up on the year-end to-do lists. Wishing everyone happy holidays and success with closing out the 2017 year.
From us, to you, to them - Direct by Design
Alert Delist Advertising Information
Click on the logos to visit the websites
CFT
Robbins
Normet
CREG-3
ES Rubber2
Muhlhauser-3
Amix
Gall Zeidler BASF NFM Datwyler-1 Dr sauer-3 Schoema
Terratec
Advertisement Contact
Binda Punj
Tel: +44 208 816 7011
RECENT CONTENT PUBLISHED ON TUNNELTALK
Most recent reporting
- Australia: West Gate gets go-ahead in Melbourne
- Russia: Road under the Neva for St Petersburg
- Germany: STUVA conference review and focus
- Alternative to horizontal road tunnel ventilation
- Rapid repair for underwater concrete
- Micro machine lift from the seabed
- 1,000 apprentices supported by Crossrail
- Turkey discusses demand and achievements
- Stockholm highway bypass contract progress
- EU reviews upskilling of construction workers
Highlights of 2017
- West Gate highway approved
- China acquires Aecon of Canada
- A leap towards smarter engineering
- Winners of the 2017 ITA Awards
- WaterFix construction sequences
- Rastatt collapse and concerns
- Paris mega metro expansion
- A family affair at WTC 2017
- Mega TBMs for Tokyo ring road drives
- Bertha has arrived!
News from the world media services
- New Zealand’s Lyttelton rail link turns 150
- Singapore to look into flood prevention
- Banihal-Qazigund road link ready in 2019
- New York examines Interstate 81 options
- Auckland’s City Rail Link reaches full depth
- Swiss mark San Bernadino pass anniversary
- Musk releases plans for new metro system
- Georgia completes country’s longest rail link
- Melbourne’s West Gate Tunnel approved
- First TBM arrives for London’s Thames Tideway
VIDEO REPORTING – Highlights of 2017

Bertha final breakthrough

Seattle SR99 interior

SEM action in Seattle

Doha Metro final breakthrough

WTC2017 Bergen

Sir Alan Muir Wood Lecture

RETC 2017, San Diego

ATC2017 Dubai

UPCOMING CONFERENCES AND EXHIBITIONS