From the Editor's Desk - 20 Sep 2012
Predictive methods for assessing ground conditions ahead of the face are evolving at pace, making deep-level tunnelling in remote regions a more manageable risk. Mitigation through enhanced predictive methodology will assist densely populated areas that face the severest topographical and climatic challenges meet their underground infrastructure and utility needs.
|