Not displaying correctly? View in your browser
Click on the logos to visit the websites
VMT DSI Underground
www.TunnelTalk.com keeping you informed
New Editorial Content
- Video: Face-to-Face with steel fibre pioneer
- Obituary: Dr Harvey Parker, Ph.D., P.E., D.GE.
- Feedback: Managing water and karst conditions
- New Products: Normet TBM tail sealants
- Company News: Managers buy out Datwyler
- Covid-19: Adapting to change
- Career Moves: Immersed tube expert at Ramboll
Recent reporting
- Switzerland: Lötschberg lining breach explained
News from the world media services
Dosing a key to quality steel fibre concrete Dosing a key to quality steel fibre concrete
Join the Alert Forward to Colleagues
From the Editor's Desk - 14 May 2020
Steel fibre reinforcement of shotcrete and segments transformed the industry, as described in the video interview with Marc Vandewalle, a pioneer of the technology. The continuing effort to develop universally accepted codes and standards of both the design and performance of the materials will lift barriers to the wider use of its many advantages over rebar reinforcement.

Share your thoughts

From us, to you, to them - Direct by Design
Alert Delist Advertising Information
Click on the logos to visit the websites
Normet CREG
Diary Dates AECOM USA
Herrenknecht
Robbins Aerolift Industrials B.V.
Gall Zeidler
For advertising details
contact the Advertising Dept
Tel: +44 208 816 8677
Tel: +1 602 399 7184
RECENT CONTENT PUBLISHED ON TUNNELTALK
Most recent reporting
- Switzerland: Lötschberg lining breach explained
- USA: BART to San Jose under further revision
- Career Moves: Immersed tube expert at Ramboll
- Job Vacancy: Lead estimator post at Barnard, USA
- BTS Dinner: Cancelled for 2020, recall past events
- Lötschberg inflow through failed lining
- Vice President speaks of DC Clean Rivers project
- Chinese TBM for Mumbai coastal highway drives
- Perth airport link completes TBM excavation
- Construction phase initiated for Fehmarnbelt
Steel fibre developments
- Crack width control in FRC segments
- SFRC durability in a chlorinated environment
- Review of FRC brittle failure considerations
- Fibre-reinforced concrete for precast segments
- 20 years of fibre concrete linings in the UK
- Lee Tunnel wins prestigious concreting award
- Spraying ultra-high performance FRC
- Hybrid steel fibre-glass fibre rebar segment
- Lab comparison of steel vs synthetic FRC
- Ridham to cast segments for Tideway West
News Briefs
- Planning of Santiago metro line 7 advances
- BC Hydro completes Peace River diversion
- Town crossing completed in Chamba, India
- Los Angeles Purple Line progress
- Brussels one step closer to new metro line
- Undersea rail crossing completed in China
- Ceneri Base Tunnel still opens on September 4
- Excavation begins on Cross River Rail in Brisbane
- Major contract awarded for Paris Metro Line 18
- Thames Water announces programme suppliers
VIDEO REPORTING – Face to face with industry leaders

TBM developments

International career

Hard rock excavation

Environment assessment

Rock mechanics

Autonomous TBM genesis

NATM in focus

High speed rail goal

UPCOMING CONFERENCES AND EXHIBITIONS