Click on the logos to visit the websites |
|
|
|
|
|
|
|
|
|
|
From the Editor's Desk - 13 Aug
2015 |
GBRs are
intended to reduce the need for costly litigation by setting out
contractually binding and meaningful descriptions of existing
geotechnical conditions. Join the debate by hitting the Feedback
button at the bottom of Tim Smirnoff's special report into the
conundrum posed by GBRs. |
From us, to you, to them - Direct
by Design |
|
Click on the logos to visit the websites |
|
|
|