From the Editor's Desk - 09 Nov
2017 |
"New technology must be part of engineering" was the message of the new ICE President in his inaugural address. Lord Robert Mair presented a future based on the courage of engineers of the past but incorporating possibilities of this technological age to build infrastructure in a smarter, more productive and more durable way.
|
From us, to you, to them - Direct by Design
|