Not displaying correctly? View in your browser
Click on the logos to visit the websites
Geodata
Datwyler-2
Geodata
VMT-1
Normet
Robbins
Terratec
www.TunnelTalk.com keeping you informed
New Editorial Content
- Workers rescued after Nepal landslide
Company News
- Melbourne mould contracts awarded
- New space for gasket and sealant innovation
TunnelTECH
- Tough rubber compound for durable gaskets
Procurement Notices
- Seattle Ship Canal CSO documents released
Diary Dates
- 18-21 Sept: InnoTrans 2018, Berlin, Germany
- 3-5 Oct: PIARC Road Tunnel Safety, France
News from the world media services
- Breakthrough at Dubai Metro's Route 2020
- Funding for Gateway plan should be re-evaluated
- Washington DC moves forward with new CSO
Double TBM breakthrough in Lucknow
Rescue from adit at Arun-3, Nepal
Join the Alert Forward to Colleagues
From the Editor's Desk - 05 Jul 2018
Thankfully incidents where workers get trapped in tunnels are rare, but the recent rescue in Nepal reminds us of the power of nature and is testament to the recovery teams who spent 40 hours to free the workers.
From us, to you, to them - Direct by Design
Alert Delist Advertising Information
Click on the logos to visit the websites
CREG
Muhlhauser-3 Lovsuns
Geokon-3 HNTB
Datwyler-2 Geodata
Herrenknecht
Schoema NFM Rascor Tsurumi Pumps BASF-1 Mayr
Sandvik
Advertisement Contact
Binda Punj
Tel: +44 208 816 7011
RECENT CONTENT PUBLISHED ON TUNNELTALK
Most recent reporting
- TBM designs and operations in focus at NAT
- VIDEO: NAT success in Washington DC
- Double breakthrough in Lucknow, India
- Contract awards for Varberg and Stockholm
- ISO certification for tunnel segment seals
- Design-build Institute of America award
- 3D geological model award shortlist
- ISO certification for geomonitoring instruments
- Nearly 1.5km/month for early finish in China
- Tunnellers gather in Washington DC for NAT
TBM operations
- Adapting to the Singapore TBM environment
- Hard-fought success in Bangalore
- Slurry or EPB for conditions in Bangalore
- Technical parameters of Seattle's mega EPBM
- TBMs rebuilt for reuse in Kuala Lumpur
- TBM equipped to control high water pressure
- Rebuilt TBMs launch on Brisbane traffic tunnel
- Keep your TBM moving against the odds
- Rebuilt TBMs - are they as good as new?
- Bertha schedule after mechanical repairs
News from the world media services
- Breakthrough at Dubai Metro's Route 2020
- Funding for Gateway plan should be re-evaluated
- Washington DC moves forward with new CSO
- Norway to start tender for Vestfold Line upgrade
- Feasibility study for Denmark-Sweden fixed link
- Norway tests record-breaking internet speeds
- More details about Malta-Gozo fixed link
- Singapore MRT uses ground freezing for station
- Work starts on fertiliser transporter in UK
- Slovakia’s longest road link faces delay
VIDEO REPORTING – TBMs in action and specifications explained

Multi-profile TBM designs from China

Factory acceptance of Follo Line TBM

Mega machine progress at Waterview

Sorting bearing seals for Bertha

Face to Face with Dick Robbins

Face to Face with Martin Herrenknecht

Mega Seattle EPBM tested in Japan

Technical details of TBM Bertha

UPCOMING CONFERENCES AND EXHIBITIONS