Not displaying correctly? View in your browser
Click on the logos to visit the websites
Schoema Dr Sauer
Herrenknecht
ITC SA Mapei SPA
CREG BabEng
Royal IHC
www.TunnelTalk.com keeping you informed
New Editorial Content
- Australia: Advancing the Snowy 2.0 project
- France: Adventurous drive breaks through
- India: EPBMs selected for Pune Metro contracts
- TAC Awards: Canada calls for excellence awards
- Career Moves: At HNTB, Golder, Hayward Baker
- WTC 2019: Preparing to meet in Naples
- WTC 2019: Exhibition location and floorplan
Recent News and Reports
- TunnelTECH: First use of MSF segments in USA
- Lesotho: Polihali Dam diversion works awarded
- Nepal: Early breakthrough for Bheri Babai TBM
Diary Dates
- 16-19 June: RETC conference, Chicago, USA
News from the world media services
Close encounter with a cavern
Close encounter with a cavern
Join the Alert Forward to Colleagues
From the Editor's Desk - 02 May 2019
Green energy production is becoming a top priority for governments and hydro and pumped storage schemes are still the most efficient generators of green energy and as batteries for energy storage but are the environmental objections to creating reservoirs and construction of installations in danger of forfeiting these advantages?

Share your views.

From us, to you, to them - Direct by Design
Alert Delist Advertising Information
Click on the logos to visit the websites
Optimas
VMT
Zitron
Brokk
Mayr
Gall Zeidler
Geodata
Normet BASF Muhlhauser Robbins TBMView Tacs
Sandvik
Advertisement Contact
Binda Punj
Tel: +44 208 816 7011
RECENT CONTENT PUBLISHED ON TUNNELTALK
Most recent reporting
- Advancing the Snowy 2.0 project
- Adventurous drive breaksthrough
- EPBMs selected for Pune Metro contracts
- Canada calls for excellence awards
- International links with China
- WTC 2019 - Exhibition navigation floorplan
- Boring begins for Bangkok Metro
- ITA calls 2019 Brunel Awards nominations
- bauma Munich 2019 roundup
- Prepare for the WTC 2019 in Naples
Remembering past colleagues
- Franz Pacher 1919-2018
- Z.Richard Bieniawski 1936-2017
- Dr. Ralph B. Peck 1912-2008
- Walter Christian Grantz 1929-2018
- George D Yoggy 1937-2018
- Lorenz Nummsen 1959-2015
- Sir Alan Muir Wood 1921 - 2009
- Dr Ing Tor L Brekke 1934-2009
- Dr Prof Dan Eisenstein 1936-2009
- Thomas R. Kuesel 1926-2010
News Briefs
- High-altitude road link opens in Tibet
- Second metro line opens in Fuzhou
- Michigan open to transport oil under Great Lakes
- Storm water drain completed for Auckland CRL
- Washington Metro gets ventilation upgrades
- Tender called for Mumbai-Ahmedabad railway
- Scottish Isles could benefit from water crossings
- Boring Company planning 56km loop
- Double breakthrough at China-Laos railway
- Repairs to Hudson river rail link considered
VIDEO REPORTING: High risk TBM drives and insurance cover

Rock bursting at Olmas

TBM headrace drive in Himalayas

Follo Line twin TBM breakthrough

Seymour-Capilano in action

TBM drive under San Francisco Bay

California HSR Southern Alignment

California HSR Northern alignment

Escalating insurance risks

UPCOMING CONFERENCES AND EXHIBITIONS