From the Editor's Desk - 01 Mar 2012
Geological investigation data, as good as it is and as accurate to the location as it can be, still leaves much to the unknown and the unforeseeable. A new study will address this conundrum anew to develop new methods of assessing rock stability by extending rock strength criteria and applying the data in three dimensions.
|