STUVA 2013 Exhibition preview Nov 2013
TunnelTalk reporting

With 138 registered exhibitors from all sectors of the underground construction industry and its support service sector, STUVA 2013 has already filed a record number of participating companies.
The biennial event, which regularly attracts more than 1,500 delegates, this year takes place at the International Congress Centre in Stuttgart, Germany, between November 27-29. The exhibition area is well organized on a single floor, giving delegates easy opportunity to keep up to date with the latest innovations, products and services from a range of key tunnel industry companies.
Click on the company name in the panel on the right to help you navigate to the stands of some of the leading companies, or click on the logos to connect directly to their websites.

List of confirmed exhibitors at the STUVA 2013 event

Company Name Booth No
3D Mapping Solutions GmbH B103
A.S.T. Bochum GmbH A103
ACO Tiefbau Vertrieb GmbH E102
AGRU Kunststofftechnik GmbH D101
Albatros Engineering GmbH B107
Amberg Engineering AG D130
Amberg Technologies AG D130
ANIXTER - Sofrasar C109
Atlas Copco MCT GmbH C131
Austin Powder GmbH B127
ave Verkehrs- und Informationstechnik GmbH G126
Babendererde Engineers GmbH G104
BASF G111
BAUER G101
Bauverlag BV GmbH C132
Belloli SA E110
Bilfinger Construction GmbH Niederlassung Tunnelbau E104
BK Giulini GmbH E108
Bochumer Eisenhütte Heintzmann GmbH & Co. KG E130
Böhm Fertigungstechnik Suhl GmbH C107
Bonar GmbH & Co. KG B112
BPA GmbH D128
BUNG Ingenieure AG C108
CDM Smith Consult GmbH D131
CFT GmbH Compact Filter Technic C117
Clariant Produkte (Deutschland) GmbH C136
Dätwyler Sealing Technologies Deutschland GmbH F103
DB International GmbH B118
DB ProjektBau GmbH G105
De Neef Conchem bvba F132
Deilmann-Haniel GmbH E128
Deilmann-Haniel Mining Systems GmbH B133
Dipl.-Ing. Bernd Gebauer Ingenieur GmbH F111
DMI Injektionstechnik GmbH A104
Dr. Spang GmbH E107
Drägerwerk AG & Co.KG B129
Durstmüler GmbH E101
Dywidag - Systems International GmbH D129
Ed. Züblin AG D102
EDR GmbH F107
Ein Shemer Rubber Industries Ltd G122
Elkuch Bator AG D106
Encardio Rite Electronics Pvt. Ltd A105
EPLASS project collaboration GmbH D108
Ernst & Sohn, Verlag für Architektur und technische Wissenschaften GmbH & Co. KG B136
Fermacell GmbH Fermacell Aestuver A112
FIDES DV-Partner Beratungs- und Vertriebs-GmbH G131
FOGTEC Brandschutz GmbH & Co. KG D105
G quadrat GeokunststoffgesmbH D101
GEODATA Group D129
GEOKON Inc. c/o Scanrock GmbH B110
germanBelt Systems GmbH D104
GHH Fahrzeuge GmbH F130
GLÖTZL Gesellschaft für Baumeßtechnik mbH F127
Grontmij GmbH E112
Gruner AG Ingenieure und Planer D103
GSE Lining Technology GmbH D111
GTA Maschinensysteme GmbH A111
Güssow-Voyé Drucklufttechnik GmbH G114
GWE pumpenboese GmbH G107
H-BAU Technik GmbH C104
Ha-Be Betonchemie GmbH & Co. KG E108
HALFEN GmbH B114
HANNING & KAHL GmbH & Co. KG G120
HBI Haerter - Beratende Ingenieure F114
Herco Kühltechnik GmbH C114
Herrenknecht AG C116
Herrenknecht Formwork Technology GmbH C116
Hochtief Solutions AG A106
Hodapp GmbH & Co. KG C115
Company Name Booth No
Hölscher Wasserbau GmbH F128
IFAB Ingenieure für angewandte Brandschutzforschung GmbH F112
IMM Maidl & Maidl Beratende Ingenieure GmbH & Co. KG B130
Implenia Schweiz AG Tunnelling & Civil Engineering F105
Ingenieurbüro Dipl.-Ing. H. Vössing GmbH E106
InnoTrans 2014 C112
Interfels GmbH G112
intermetric GmbH F106
ITC SA - Inter Techno Commerce SA B105
ITE GmbH A115
itmsoil Interfels G112
Jähnig GmbH Felssicherung & Zaunbau B113
JENNMAR Corporation G117
JORDAHL GmbH C104
Kapyfract AG C105
Keller Grundbau GmbH E109
Kern Tunneltechnik SA F129
Korfmann Lufttechnik GmbH C117
KrampeHarex GmbH & Co. KG G106
KTI-Plersch Kältetechnik GmbH F104
Langmatz GmbH G129
Leica Geosystems GmbH Vertrieb B116
Liebherr-France SAS F110
LKAB Minerals GmbH B119
MAPEI GmbH A101
Max Bögl Bauunternehmung GmbH & Co. KG D132
MAXAM Deutschland GmbH G114
MC - Bauchemie Müller GmbH & Co. KG A107
McDowell B. Equipment E103
Minova CarboTech GmbH G102
Minroc Bohrausrüstungen GmbH G116
Mooser Schwingungstechnik GmbH C103
NAUE GmbH & Co. KG E105
Normet International LTD. C111
Obermann GmbH A102
OBERMEYER Planen + Beraten GmbH D110
OSMO-Anlagenbau GmbH & Co. KG B102
Palmieri S.p.A. B108
Patrona Versicherungsvermittlungs-GmbH C101
Pressluft Frankfurt Drucklufttechnik GmbH G124
Promat GmbH C133
Putzmeister Concrete Pumps GmbH F129
Rascor (Deutschland) GmbH E127
RK safetec GmbH G113
Rockmore International GmbH G121
Rowa Tunnelling Logistics AG E110
S & B Industrial Minerals GmbH G103
Sandvik Mining and Construction Central Europe GmbH C102
Schauenburg MAB GmbH B111
Schauenburg Tunnel-Ventilation GmbH C114
Schüßler-Plan Ingenieurgesellschaft mbH A110
Sika Deutschland GmbH F130
SOFiSTiK AG G131
Söndgerath Pumpen GmbH C103
SSF Ingenieure AG Beratende Ingenieure im Bauwesen F101
StekoX GmbH Abdichtungstechnik E126
STS Scheltzke GmbH & Co. KG F102
STUVA G134
Swibox AG F116
The Robbins Company B101
TPH Bausysteme GmbH D107
Tsurumi ( Europe ) GmbH A113
VersuchsStollen Hagerbach AG D130
VMT GmbH Gesellschaft für Vermessungstechnik F108
Wayss & Freytag Ingenieurbau AG F109
WBI Prof. Dr.-Ing. W. Wittke Beratende Ingenieure für Grundbau und Felsbau GmbH A109
Webac-Chemie GmbH A114
Zeppelin Baumaschinen GmbH B109
Zeppelin Rental GmbH & Co. KG B109
ZERNA Unternehmensgruppe C118

           

Add your comment

Thank you for taking the time to share your thoughts and comments. You share in the wider tunnelling community, so please keep your comments smart and civil. Don't attack other readers personally, and keep your language professional.
In case of an error submitting Feedback, copy and send the text to Feedback@TunnelTalk.com
Name :


Date :

Email :


Phone No :

   Security Image Refresh
Enter the security code :
No spaces, case-sensitive